We had a large project that was running over budget. We brought Warren and his team in and they were able to extract well over $900,000 in savings through value engineering. They’ve been able to corral this project in and are doing a really good job of making some tough decisions as well. They’ve provided leadership and guidance to the hospital, the contractor, and the architects.
Brian Hitchcock, VP, Material Resource Operations, Capella Healthcare